Solar EPC for Punjab, Haryana, Himachal and Chandigarh

Your roof can pay your power bill.

Rooftop, farm and factory solar for Punjab, Haryana, Himachal Pradesh and Chandigarh, designed in 3D, priced line by line, maintained for life.

Book site survey

One sun over Punjab, Haryana, Himachal and Chandigarh

Brand film, 45 seconds, with sound and captions.

Estimate savings Type your bill, see a system size.

Rows of solar panels in a misty field at dawn, under an orange sky
Sun position over Ludhiana, live

What we work within

  • PM Surya Ghar filing Applications handled
  • Net metering With PSPCL, UHBVN, DHBVN, HPSEBL and CPDL
  • PM-KUSUM pumps Filed when a window opens
  • ALMM and DCR modules For subsidy systems
  • Office in Ludhiana Serving Punjab, Haryana, Himachal and Chandigarh
  • Call us +91 99884 20205

State nodal agencies for solar: PEDA (Punjab), HAREDA (Haryana), HIMURJA (Himachal) and CREST (Chandigarh).

How a project runs

Watch one rooftop go from survey to savings. Pick a chapter to jump to it.

  1. Your roof already catches the sun.
  2. We survey it and design it in 3D.
  3. Every panel, cable and bolt, priced line by line.
  4. Subsidy and PSPCL net-metering paperwork, handled.
  5. Sunlight in. Your meter turns back.
  6. Watch every unit on your phone.
  7. Clean panels make more power. We wash and inspect them.
  8. Run a solar business? Use our CRM under your brand.
  9. Wesics Energies, Ludhiana. Survey to savings.

Size your system from your bill

Type your monthly bill. See a system size, the energy charges it could offset and the subsidy it could earn.

State
Connection type

From your last PSPCL bill. Type it or move the slider.

What you pay per unit, taxes included. Your bill shows it.

Assumes about 120 units per kW per month and your tariff. An estimate, not a quote. Subsidy needs DCR modules and a PM Surya Ghar application.

Book site survey

For a ₹4,000 monthly bill, a 4.5 kW home system could make about 540 units a month, covering about 100 percent of the units you use. It could offset up to ₹4,000 a month of energy charges, ₹48,000 a year. Fixed and meter charges stay.

Suggested system size

4.5kW

Covers about 100% of the units you use

Units generated a month
540
Energy charges offset, up to (a month)
₹4,000
Energy charges offset, up to (a year)
₹48,000
Roof area needed
450 sq ft
PM Surya Ghar subsidy ₹78,000
  1. 1 kW ₹30,000
  2. 2 kW ₹60,000
  3. 3 kW+ ₹78,000
  • Upper bound: your bill also carries fixed and meter charges that solar does not remove.
  • Punjab's free-units scheme for homes is not included in this estimate.

Cleaning and maintenance that keeps output high

Dust and bird droppings from fields and roads cut output. We look after plants installed by anyone.

Wash: scheduled panel cleaning

For newer plants that mostly need dust and droppings kept off the glass.

  • Scheduled cleaning of every panel
  • Soft brushes and low-TDS water
  • Before and after photos of each visit
  • Monthly, fortnightly or weekly visits

Care: cleaning plus preventive inspection

For plants past their first year, or any system you want checked end to end.

Everything in Wash, plus

  • Torque and earthing checks
  • Inverter log review
  • DC and AC cable and connector check
  • Yearly thermal scan

Assure: Care plus monitoring

For farms, factories and shops where lost generation costs money every day.

Everything in Care, plus

  • Generation monitoring with alerts
  • Priority for breakdown visits
  • Yearly performance report

Priced per kW after a site visit.

New PM Surya Ghar systems include five years of maintenance from the installer. Our plans cover cleaning and everything after.

Book site survey
Three crew members in orange and yellow overalls cleaning rooftop solar panels with long-handled soft brushes.

For solar businesses

Your brand. Our CRM. Built for solar in India.

Installers, EPCs and vendors can run leads, quotes, 3D designs, subsidy paperwork and maintenance on our platform under their own name.

Brand colour
Your Solar Co

Rooftop solar proposal, 5 kW

  • Modules 10 x 545 Wp
  • Inverter 5 kW on-grid
  • Mounting structure GI sections
  • Cables and earthing 4 sq mm DC

Specifications and prices come from your own price book

Sell

  • Lead CRM with calling queue
  • WhatsApp and SMS templates
  • Monthly targets and automation
  • Collections, invoices and ledger

Design and quote

  • Solar calculator with your price books and itemised bill of materials
  • 3D site designer with shading
  • PDF proposals with QR

Deliver

  • PM Surya Ghar and DISCOM net-metering tracker
  • Purchase orders from the bill of materials
  • Installer work orders and checklists
  • Project documents
  • Inventory by warehouse

Serve

  • Client portal
  • Monitoring alerts
  • Service tickets
  • Referral and commission ledger
  • Access matrix per user

Also for vendors: a supplier portal for purchase orders and deliveries.

Request partner demo

Questions people ask us

Not here? Call and ask us directly.

+91 99884 20205
How much subsidy can I get?

Under PM Surya Ghar, central assistance is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, up to ₹78,000. You need DCR modules and an application on the national portal. Himachal Pradesh is a special-category state: ₹33,000 per kW for the first 2 kW and ₹19,800 for the third kW, up to ₹85,800. The central government sets these amounts and can change them.

Do you handle net metering?

Yes. We file the net-metering application and coordinate the DISCOM inspection with PSPCL in Punjab, UHBVN or DHBVN in Haryana, HPSEBL in Himachal Pradesh, or CPDL in Chandigarh.

Do you work in Haryana?

Yes. We serve Haryana from our Ludhiana office. Net metering is filed with UHBVN or DHBVN, depending on your area, and PM-KUSUM pump applications go through HAREDA.

Do you work in Himachal and Chandigarh?

Yes. We serve both from our Ludhiana office. In Himachal Pradesh, net metering is filed with HPSEBL and PM-KUSUM pump applications go through HIMURJA. Net metering under the HPERC rooftop solar regulations: up to 10 kW on single-phase and 20 kW on three-phase connections (1 MW at 11 kV); systems up to 10 kW need no feasibility study. In Chandigarh, net metering is filed with CPDL under JERC rules, and CREST is the solar nodal agency.

Is rooftop solar mandatory in Chandigarh?

Rooftop solar has been mandatory for houses on plots of 500 sq yd and above since 2016, and for government, institutional and commercial buildings. Extending it to smaller plots has been proposed. Tell us your plot size and building type and we will check whether it applies to you.

How long does installation take?

Most homes are installed in a few days once materials arrive. Approvals and net metering take longer and depend on your DISCOM.

How often should panels be cleaned?

In dusty seasons, every 2 to 4 weeks. We set a schedule after looking at your site.

Do you maintain plants installed by others?

Yes. Our Wash, Care and Assure plans cover plants installed by any company.

What is the white-label CRM?

It is our solar CRM, offered to installers, EPCs and vendors under their own name. It handles leads, quotes, 3D designs, subsidy paperwork and maintenance. See the partner page.

Is the savings estimate a quote?

No. The estimate uses typical yields and the tariff you enter. A site survey gives you an itemised quote.

Let's put your roof to work.

We survey roofs across Punjab, Haryana, Himachal Pradesh and Chandigarh from Ludhiana. You get an itemised quote, a 3D layout and a clear path through subsidy and net metering.

Jalandhar Bypass, Ludhiana 141088 info@wesicsenergies.com