Chandigarh Airport Terminal

An airport terminal with a rooftop solar installation.

Ludhiana
Jalandhar
Patiala
Ambala
Karnal
Kurukshetra
Shimla
Una
Hamirpur
Baddi

Sector 14, Chandigarh Open the map

Project details

As stated in the project record. The record is awaiting confirmation from the owner.

System

Capacity
1,500 kW
Project type
Institutional
Client type
Transportation
System type
Grid-tied with backup
Place
Sector 14, Chandigarh
Status
Completed
Completed
March 2024

Equipment

Panel brand
Trina Solar
Inverter brand
SMA

Brands are as listed in the record.

Outcomes and service

Modelled output
1,80,000 kWh a month
Maintenance contract
Yes

Output is modelled at 120 kWh per kW per month, our typical rooftop yield assumption. It is not measured generation.

Noted in the record

  • Backup supply
  • Passenger information displays

More projects nearby and alike

All projects

Let's put your roof to work.

We survey roofs across Punjab, Haryana, Himachal Pradesh and Chandigarh from Ludhiana. You get an itemised quote, a 3D layout and a clear path through subsidy and net metering.

Jalandhar Bypass, Ludhiana 141088 info@wesicsenergies.com