Chandigarh Airport Terminal
An airport terminal with a rooftop solar installation.
Ludhiana
Jalandhar
Patiala
Ambala
Karnal
Kurukshetra
Shimla
Una
Hamirpur
Baddi
Sector 14, Chandigarh Open the map
Project details
As stated in the project record. The record is awaiting confirmation from the owner.
System
- Capacity
- 1,500 kW
- Project type
- Institutional
- Client type
- Transportation
- System type
- Grid-tied with backup
- Place
- Sector 14, Chandigarh
- Status
- Completed
- Completed
- March 2024
Equipment
- Panel brand
- Trina Solar
- Inverter brand
- SMA
Brands are as listed in the record.
Outcomes and service
- Modelled output
- 1,80,000 kWh a month
- Maintenance contract
- Yes
Output is modelled at 120 kWh per kW per month, our typical rooftop yield assumption. It is not measured generation.
Noted in the record
- Backup supply
- Passenger information displays
More projects nearby and alike
All projectsLet's put your roof to work.
We survey roofs across Punjab, Haryana, Himachal Pradesh and Chandigarh from Ludhiana. You get an itemised quote, a 3D layout and a clear path through subsidy and net metering.
Jalandhar Bypass, Ludhiana 141088 info@wesicsenergies.com