Deepak Textiles Ltd
A textile manufacturing unit with an 800 kW rooftop solar installation.
Punjab
Amritsar
Jalandhar
Patiala
Bathinda
Mohali
Ambala
Kurukshetra
Shimla
Mandi
Una
Hamirpur
Baddi
Focal Point, Ludhiana Open the map
Project details
As stated in the project record. The record is awaiting confirmation from the owner.
System
- Capacity
- 800 kW
- Project type
- Industrial
- Client type
- Textile manufacturing
- System type
- Grid-tied
- Place
- Focal Point, Ludhiana
- Status
- Completed
- Completed
- June 2024
Equipment
- Panel brand
- Jinko Solar
- Inverter brand
- Sungrow
Brands are as listed in the record.
Outcomes and service
- Modelled output
- 96,000 kWh a month
- Maintenance contract
- Yes
Output is modelled at 120 kWh per kW per month, our typical rooftop yield assumption. It is not measured generation.
Noted in the record
- Peak hour optimization
More projects nearby and alike
All projectsLet's put your roof to work.
We survey roofs across Punjab, Haryana, Himachal Pradesh and Chandigarh from Ludhiana. You get an itemised quote, a 3D layout and a clear path through subsidy and net metering.
Jalandhar Bypass, Ludhiana 141088 info@wesicsenergies.com